We provided construction management for this contemporary villa, from site supervision through to handover, after taking over the site at the end of the project.
Our work covered overall management: coordination of contractors, quality control at every stage, schedule management and the settling of technical points with the architect. Rigorous supervision enabled us to deliver a building that met the original requirements, within the set timeframe.
Scope
- New build
- High-end specification
- Mandate taken over while under way to ensure project continuity
Fact sheet
- Location
- Vésenaz
- Project type
- Residential
- Project owner
- Private client
- Architect
- Favre + Guth
- Period
- 2025 à 2026
- Status
- Completed in 2026
- Area
- 850 m² villa
- Our role
- Construction management, site taken over at the end of the project
The project in pictures
Other projects
6 of 12 projects
-
Energy renovation
Peillonnex 36
Chêne-Bourg
Completed in 2026
Rental building, 32 apartments
View project
-
Residential
Jean-Achard 9
Completed in 2025
Apartment
View project
-
Energy renovation
Le Passing
Cologny
Works in progress, completion in 2027
700 m²
View project
Why work with AKB Project?