A building handed over once it works
For which projects
The industrial and commercial buildings we manage
We manage projects where technical systems account for a large share of the cost.
-
An industrial building
A fire safety compliance upgrade, phased so that the building remains operational and safe.
-
A production workshop
Each connection is prepared as a separate operation, with its own outage date and duration.
-
A laboratory
Technical packages coordinated: HVAC, electrical, building controls, low-voltage systems.
-
Office space
All trades on a shared schedule: your teams move on a known date.
They have trusted us
Architects, developers, property managers, public institutions and private owners entrust us with the management of their projects in French-speaking Switzerland.
What you gain
What has to keep running keeps running
What worries youWhat we do
-
Our building dates from before 1991.
A survey becomes mandatory, in Geneva and in the canton of Vaud alike. If it reveals asbestos, asbestos removal comes first.
Before pricing
-
An outage could stop production.
What has to keep running is identified before the works: power supplies, networks, controls, safety systems.
Every outage planned
-
Who answers for safety on site?
Each contractor, for its own staff. Shared protective measures, such as scaffolding, are set out in the contracts: we see to that.
-
We are handed a building that does not work yet.
Testing and technical acceptance are part of the schedule, before the building is handed over.
Technical acceptance included
-
Our teams will discover the systems at the first breakdown.
The as-built documentation, the memory of the building, is handed to them in time, and we train your operating teams.
As-built drawings
Our role
What we handle on an industrial or commercial project
On a site in operation, the method first serves to protect operations: each stage is prepared with the teams who work there.
-
The schedule
The schedule incorporates operational constraints and testing, since commissioning determines handover.
From the outset
-
The works
We organise how the works coexist with your teams and enforce safety and lockout procedures. The technical packages advance on the same schedule.
During the works
-
Commissioning
Heating, ventilation, air conditioning, electrical and control systems are tested and accepted before the building is handed over.
Before handover
-
Handover
We hand over the as-built documentation and train your operating teams. Defects are then tracked until they are cleared.
Until all defects are cleared
How we work
The building is not an end in itself
It must allow a business to operate. On a site in operation, coordination takes place with the site’s technical teams.
- We do not carry out any works and have no commercial ties with the contractors.
- A single point of contact, from the first meeting to the end of the warranty period.
- You receive the information as it is, even when it is bad news.
- You know at all times where your project stands, without having to ask.
Projects
Our industrial and commercial projects
In Begnins, the construction of a multi-purpose building; in Morges, an industrial complex upgraded for compliance while operations continue.
6 of 12 projects
-
Industrial & commercial
La Remise de Begnins
Begnins
Works in progress, completion in 2027
4 500 m²
View project
-
Industrial & commercial
Lausanne 55-57
Morges
Completed in 2025
Industrial complex, workshop space
View project
-
Energy renovation
Peillonnex 36
Chêne-Bourg
Completed in 2026
Rental building, 32 apartments
View project
-
Energy renovation
Gustave Moynier 2
Geneva
Completed in 2024
Rental building: 12 apartments renovated, 3 created in the attic
View project
No projects have been published yet for this project type.
Site in operation
Refurbishing your premises without stopping operations? It can be done.
It all starts with your constraints: which areas must remain accessible, and which systems can never stop?
Your questions about industrial and commercial projects
Can you refurbish our premises without stopping our operations?
It can be done, and Morges proves it: an industrial complex there was upgraded for compliance while operations continued. It all starts with your constraints. Which areas must remain accessible and which systems can never stop? The phasing of the works is built with your teams, based on these answers.
Do you handle office fit-out or refurbishment?
Yes, from initial studies to moving day. Refitting an office floor involves many trades over a short period: partitions, floors, ceilings, ventilation, electrical, low-voltage systems, then furniture. We coordinate them on a shared schedule and check early what requires a permit. In Geneva, a change to the interior layout or to the use of the premises requires one, often under the accelerated procedure. Your teams can then move on a known date.
Can you bring an industrial building into line with fire regulations?
That is the heart of the Morges project, carried out with the building occupied. The compliance upgrade follows the Swiss fire protection regulations issued by the AEAI: the 2015 edition remains in force, and a revision is in preparation. A specialist draws up the fire safety concept. We then coordinate the resulting work (compartmentation, doors, exits, detection) and phase it so that the building remains operational and safe throughout the works.
Our building dates from before 1991: what difference does asbestos make to the project?
A survey becomes mandatory. In Geneva, any intervention on parts built before 1991 requires a search for asbestos and PCBs before the works, whether or not the project is subject to a permit; in the canton of Vaud, the asbestos survey is attached to the permit application. If the survey reveals any, asbestos removal comes before the works and weighs on the schedule and budget. It is better to know before the works are priced.
How do you connect new systems to those already running?
By getting to know them first. What has to keep running during the works is identified before they begin: power supplies, networks, controls, safety systems. Each connection is then prepared as a separate operation, with its own outage date and duration. Heating, ventilation, air conditioning, electrical and control systems are coordinated on the same schedule.
Who is responsible for safety on site?
Each contractor, for its own staff. The Construction Work Ordinance (OTConst) requires it to have a safety plan before the works begin and a competent person on site. Protective measures used by several contractors, such as scaffolding or guardrails, must be set out in the works contracts. We have them written in, then see that they are respected.
What does the file handed over at the end of the works contain?
The as-built documentation brings together what your teams need to operate the building and enforce the warranties: as-built drawings, test and handover reports, manuals and technical data sheets for the systems, maintenance plans, contractor warranties and a list of their contact details. It is the memory of the building. Handed over in time, it saves you from discovering a system at the first breakdown.
Let us talk about your project
Describe your project in a few lines. We will get back to you within 48 working hours to arrange a first conversation, without obligation.
Thank you, we have received your enquiry
We will get back to you within 48 working hours.
Your message could not be sent.
Please try again in a moment, or write to us at info@akbproject.ch.
Our other project types
-
Residential
New villas and apartment buildings, designed for comfort and quality of life, with execution kept under control at every stage.
-
Energy renovation
Upgrading existing buildings and improving their energy performance, to add lasting value to property assets.
-
Retail & luxury
High-end boutiques and showrooms: finishes judged down to the last detail and a fixed opening date, in keeping with the brand’s image.