Energy renovation
A better-performing building, without moving its residents out
For which projects
The renovations we manage
These works are most often carried out with the building occupied, and tenants or operators on the premises.
-
An IDC that is too high
In Geneva, above 125 kWh/m²·year, an audit and improvement measures are required.
-
A condominium (PPE)
The works are voted on at the owners’ meeting: we prepare the costed options put to the vote.
-
A rental building
LDTR in Geneva, LPPPL in the canton of Vaud: to be checked as early as the feasibility study.
-
A heating system to replace
Insulating the building envelope first makes it possible to size a smaller system.
They have trusted us
Architects, developers, property managers, public institutions and private owners entrust us with the management of their projects in French-speaking Switzerland.
What you gain
You choose knowing what each option brings in
What worries youWhat we do
-
I do not know where to start.
With a condition survey; quotes come afterwards. The CECB Plus proposes up to three renovation options.
Before any quote
-
I am afraid of investing in the wrong works.
Each option is costed with its return on investment: what it costs, and what it brings in.
Options compared
-
What if I lose the subsidies?
The rule: apply before you start. In Geneva, at least 14 days before the works; in the canton of Vaud, the application must be approved beforehand.
-
My tenants will have to move out.
Often not: the works are phased by stairwell or by floor, with interruptions announced in advance.
Usually without rehousing
-
I am promised savings, but who verifies them?
At commissioning, the performance achieved is checked.
The concrete measure of the result
Our role
What we handle on an energy renovation
An energy renovation is prepared around a building that is in daily use: the studies and the schedule matter as much as the works themselves.
-
Assessment and studies
We coordinate the energy assessment and the preliminary studies. They show what to tackle first: building envelope, windows and doors, heating or photovoltaic generation.
Before deciding
-
Costed options
Each option is costed with its return on investment: you choose knowing what it brings in.
Before the works
-
Phasing in an occupied building
When tenants stay in place, we phase the works and coordinate interruptions to heating, water and electricity.
During construction
-
Commissioning
We check the performance achieved, the concrete measure of the result of your renovation.
At handover
How we work
A coherent whole, not an accumulation of measures
A renovation in stages is still possible if it follows an overall plan. That is one of the roles of the CECB Plus.
- The order always matters: building envelope before heating.
- We do not carry out any works and have no commercial ties with the contractors.
- A single point of contact, from the first meeting to the end of the warranty period.
- You receive the information as it is, even when it is bad news.
Projects
Our energy renovation projects
In Lausanne as in Geneva, buildings renovated or being renovated with their residents in place: building envelope, windows and doors, heating, with works phased so that nobody has to move out.
6 of 12 projects
-
Energy renovation
Peillonnex 36
Chêne-Bourg
Completed in 2026
Rental building, 32 apartments
View project
-
Energy renovation
Gustave Moynier 2
Geneva
Completed in 2024
Rental building: 12 apartments renovated, 3 created in the attic
View project
-
Energy renovation
Reposoir 10-14
Lausanne
Works in progress, completion in 2027
2 200 m²
View project
-
Energy renovation
Pré-Fleuri 13-15-17
Works in progress, completion in 2027
3 100 m²
Residential building, 25 apartments
View project
-
Energy renovation
Le Passing
Cologny
Works in progress, completion in 2027
700 m²
View project
-
Industrial & commercial
La Remise de Begnins
Begnins
Works in progress, completion in 2027
4 500 m²
View project
-
Industrial & commercial
Lausanne 55-57
Morges
Completed in 2025
Industrial complex, workshop space
View project
-
Residential
Hauts-Monts 15
Anières
Completed in 2025
800 m² villa
View project
No projects have been published yet for this project type.
Occupied building
Renovating without rehousing tenants? Often, yes.
Success depends as much on technical expertise as on how the phasing is organised and on the information given to occupants.
Your questions about energy renovation
The IDC of my building exceeds the Geneva threshold: what do I need to do?
In Geneva, the owner of a heated building reports the building’s heat expenditure index (IDC) to the cantonal energy office every year. Above 125 kWh/m²·year, an energy audit and improvement measures are required. Beyond a higher threshold, the building must be renovated to bring it back below 125. That threshold will soon fall. It stands at 222 kWh/m²·year until the end of 2026, then 180 from 1 January 2027. We coordinate the audit and the studies, then price the options so that you can decide.
Where to start: a condition survey (CECB or audit) or quotes?
With a condition survey. Quotes come afterwards. The CECB, the cantonal building energy certificate, rates the building envelope and the energy balance from A to G; the CECB Plus adds up to three renovation proposals suited to your objectives and budget. It is drawn up by a certified expert and becomes mandatory for a Buildings Programme subsidy application once the contribution reaches CHF 10,000. We coordinate these studies, then have the selected options priced.
Is it better to renovate everything at once, or in stages?
That depends on the condition of the building and on your cash flow. The order, however, always matters. Insulating the building envelope before replacing the heating makes it possible, for example, to size a smaller system. A renovation in stages is still possible if it follows an overall plan: that is one of the roles of the CECB Plus. We cost each option with its return on investment. The aim is a coherent whole, not an accumulation of measures.
What subsidies are available, and when should I apply for them?
The Buildings Programme of the Swiss Confederation and the cantons supports the insulation of the building envelope and the replacement of fossil-fuel heating with renewable energy; each canton sets its own conditions. The rule to remember: apply before you start. In Geneva, the application must reach the cantonal energy office at least 14 days before the works begin; in the canton of Vaud, it must be approved beforehand. The schedule takes this into account.
Our building is a PPE condominium: how do we decide on the works?
At the owners’ meeting, in accordance with the Swiss Civil Code. Works needed to maintain the building’s value are decided by a majority of all co-owners, not only of those present. Useful works, which increase value or yield, also require that this majority hold more than half of the shares. Embellishment work in principle requires unanimity. We prepare the costed options put to the vote, then liaise with your representatives during the works.
What steps are required before renovating a rental building?
Two cantonal laws apply in addition to the building permit. In Geneva, the LDTR makes the renovation of housing subject to authorisation, and the State sets the maximum rents after the works, for a limited period. In the canton of Vaud, the LPPPL makes substantial renovations of rented housing subject to authorisation in districts with a housing shortage; tenants are informed at least 40 days before the application is filed. Both weigh on the yield. It is best to check them as early as the feasibility study.
Can a building be renovated without rehousing the tenants?
Often, yes. In Lausanne, we are managing the renovation of a building of 26 apartments without rehousing the occupants; in Geneva, another building was renovated in two handover phases so that nobody had to move out. Tenancy law permits such works if they can reasonably be imposed on the tenants, who may, however, claim a rent reduction for as long as the disturbance lasts. Keeping occupants informed, both by the property manager and by us, therefore matters as much as the phasing.
Let us talk about your project
Describe your project in a few lines. We will get back to you within 48 working hours to arrange a first conversation, without obligation.
Thank you, we have received your enquiry
We will get back to you within 48 working hours.
Your message could not be sent.
Please try again in a moment, or write to us at info@akbproject.ch.
Our other project types
-
Residential
Villas, apartments and new apartment buildings, designed for comfort and quality of life, with construction kept under control at every stage.
-
Retail & luxury
High-end boutiques and showrooms: finishes judged down to the last detail and a fixed opening date, in keeping with the brand’s image.
-
Industrial & commercial
Industrial buildings and office space, with demanding technical constraints and operational requirements.